BEST cold patching sealant is a one-component cold patching emulsified asphalt crack sealant treated with rubber, designed to fill cracks of 12 mm wide on the surface of highway. BEST cold patching material provides a protective barrier to prevent moisture from entering the road surface. BEST cold patching material is an economical and easy-to-use product.
Basic use: BEST cold fill grouting material is specially designed for asphalt pavement. The width can fill 12 millimeter cracks.
Composition: BEST cold filling sealant is a polymer modified emulsified asphalt sealant, which uses concentrate ore as reinforcing filler.
Packaging: BEST cold filling sealant has three kinds of packaging, one gallon, five gallons, and 55 gallons (4.9 kg, 24.4 kg, 267.8 kg).
Color: black.
Limit: BEST cold fill grouting material can not be used within 24 hours when the temperature is near or below 10 C.
technical data
Environmental protection requirements
BEST cold filling sealant is an environmentally friendly water-based crack sealant with VOC less than 150 g per liter.
Physical / chemical properties:
BEST cold fill grouting material meets the following test requirements.ASTM D140, ASTM D466, ASTM D529, ASTM D2939,and ASTM
Cracks must be clean, debris and plants should be thoroughly cleaned up.
Construction method∶BEST cold filling material can be directly from containers (5 kg product with filling nozzle), filling tanks or suitable mechanical pump equipment. Using rubber Broom material to scrape material onto pavement cracks can also achieve better results.
(cold patch sealant)
(U push construction)
Mixed procedure:
Mix raw materials thoroughly. BEST cold fill grouting material is a material that can be used directly.
Requirements:
Use rubber broom to scrape raw materials into cracks and adjacent roads. Do not open traffic before the material is completely dried.
Estimating material demand:
The amount of construction is related to the depth and width of the cracks. Normally, 1 kilograms of BEST cold fill grouting material can fill cracks about 4.5-9 meters.
Points for attention:
The temperature of the surface and surrounding environment must not be less than 10 degrees Celsius. The temperature should not be less than 10 degrees within 24 hours before and after construction. Don't put it where children can touch it. We should pay attention to frost prevention when products are preserved.